• Propriety: Fortaleza Government
  • Engineering: COBRA Instalaciones y Servicios SA
  • Location: Fortaleza (Brasil)
  • Year: 2011-2014
  • PEM: 17.000.000 euro (facilities)

Description:
Construction of new Stadium Castelao, in Fortaleza (Brasil), 67.000 seats.
Demolition and reconstruction of the bottom tier for the world Cup 2014.

Performed Works:
FACILITIES TECHNICAL ASSISTANCE
Technical assistance for the facilities of the stadium, with re-calculations, and development of execution drawigns for the installer, Cobra.

Facilities: HV and LV network, Generation set, lighting, CCTV and access control, IT installation.

Related Work

RENOVATION OF BRENNTAG CHEMICAL

Enlargement of the fa

CEMENT INDUSTRY IN RUFISKE

Construction project

FAMILIAR HOUSES
Design and project management of familiar houses. Urbaniza