• Propriety: Generalitat Valenciana (GTP)
  • Engineering: CMD Ingenieros
  • Location: Manises, España
  • Year: 2010-2011
  • PEM: 33.000.000 € (3.000.000 € instal.)

Project for the prolongation of the maneuvering branch of the subway Line 3 in Valencia, Tavernes direction, including the subway station. Definition and design of the elements needed to allow the arrival of the subway line to Tavernes Blanques, through a tunnel. The phreatic level becomes the most important condition in the civil calculation, as well as the specific facilities for the trains circulation and ventilation.CIVIL ENGINEERING / Basic Project Coordination and Execution. Calculation of structures and foundations.

FACILITIES ENGINEERING / Drafting and projecting coordinator of facilities associated with the construction of the station and its surroundings: wiring and low voltage, lighting, plumbing and sanitation, access control and security, fire protection, ventilation, building management systems and communication facilities.

Related Work

MONASTERY HOLY SPIRIT OF GILET
Rehabilitation of the Hospice of the Holy Spirit Monastery o